EN
Translate:
EN
Signed in as:
filler@godaddy.com
EN
Translate:
EN
Signed in as:
filler@godaddy.com
Flowmeters on the Certified Water Flowmeter List have been certified by their manufacturers to comply with Kansas’ specifications for water flowmeters in K.A.R. 5-1-4. These flowmeters are acceptable to use when the chief engineer requires a water flowmeter pursuant to K.A.R. 5-1-7. In addition, if the chief engineer requires a water flowmeter, the flowmeter must be installed as specified in K.A.R. 5-1-6 and be maintained as specified in K.A.R. 5-1-8 and 5-1-9.
Certification for a water flowmeter model does not constitute endorsement by the chief engineer, the Division of Water Resources, nor the Kansas Department of Agriculture. Click the image above to download a copy of the full list.
Whenever a flowmeter is repaired or replaced, KDA-DWR and District office require a repair/replacement form (DWR 1-560) to be filed with our offices. A copy of this form can be downloaded by clicking the image above.
Copyright © 2023
Big Bend Groundwater Management District 5 - All Rights Reserved
This website uses cookies. By continuing to use this site, you accept our use of cookies.